# Software Development and Maintenance Plan
|
||
|
||
**Document Change History**
|
||
|
||
| Version | Date | Author | Change Comment |
|
||
|---------|------------|----------------|----------------|
|
||
| 0.1 | 2023-02-01 | Markus Thielen | Draft |
|
||
|
||
> This document is related to your product. You somehow need to associate it with it. The easiest way would be
|
||
> to just put all product-related documents into a folder in your QMS so that the association is
|
||
> clear. Alternatively, you could mention the related product and version here, but then you'd have to update
|
||
> the version here any time you do a new release. Painful!
|
||
|
||
This document summarizes development and maintenance activities.
|
||
|
||
## Mapping of Standard Requirements to Document Sections
|
||
|
||
| ISO 13485:2016 Section | Document Section |
|
||
|---------------------------------------|------------------|
|
||
| 7.3.2 Design and Development Planning | 1, 2, 3, 7 |
|
||
|
||
| Classes | IEC 62304:2006 Section | Document Section |
|
||
|---------|----------------------------------------------------------------------------|------------------|
|
||
| A, B, C | 4.4.2 Risk Management Activities | 1 |
|
||
| A, B, C | 5.1.1 a) (Processes) | 1 |
|
||
| A, B, C | 5.1.1 b) (Deliverables) | 1 |
|
||
| A, B, C | 5.1.1 c) (Traceability) | 1 |
|
||
| A, B, C | 5.1.1 d) (Configuration and Change Management) | 1, 5 |
|
||
| A, B, C | 5.1.1 e) (Problem Resolution) | 1 |
|
||
| A, B, C | 5.1.2 Keep Software Development Plan Updated | 1 |
|
||
| A, B, C | 5.1.3 Software Development Plan Reference to System Design and Development | 2 |
|
||
| C | 5.1.4 Software Development Standards, Methods and Tools Planning | |
|
||
| B, C | 5.1.5 Software Integration and Integration Test Planning | 3, 8 |
|
||
| A, B, C | 5.1.6 Software Verification Planning | 7 |
|
||
| A, B, C | 5.1.7 Software Risk Management Planning | 1 |
|
||
| A, B, C | 5.1.8 Documentation Planning | 6 |
|
||
| A, B, C | 5.1.9 Software Configuration Management Planning | 5 |
|
||
| B, C | 5.1.10 Supporting Items to be Controlled | 5 |
|
||
| B, C | 5.1.11 Software Configuration Item Control Before Verification | 5 |
|
||
| B, C | 5.1.12 Identification and Avoidance of Common Software Defects | 4 |
|
||
| A, B, C | 6.1 Software Maintenance Plan. | 9 |
|
||
|
||
## 1 Relevant Processes and Documents
|
||
|
||
Please see the relevant processes for the following activities:
|
||
|
||
* Risk management activities incl. SOUP risks: SOP Integrated Software Development
|
||
* Problem resolution: SOP Problem Resolution
|
||
* Software development incl. deliverables, traceability, regular update of software development plan: SOP
|
||
Integrated Software Development
|
||
* Change management: SOP Change Management
|
||
* SOUP List
|
||
* SOP Usability Engineering
|
||
|
||
## 2. Required Resources
|
||
|
||
### 2.1 Team
|
||
|
||
| Role | Count | Names |
|
||
|--------------------|-------|--------------------------|
|
||
| Frontend Developer | 2 | Ada Lovelace, Steve Jobs |
|
||
| Backend Developer | 1 | Alan Turing |
|
||
|
||
### 2.2 Software
|
||
|
||
Describe your device's software safety class according to IEC 62304 and your reasoning behind the classification.
|
||
|
||
#### Programming Languages
|
||
|
||
> List the languages you’ll be using, including compiler and language versions.
|
||
|
||
| Name | Version |
|
||
|--------|---------|
|
||
| Python | 3.8 |
|
||
|
||
#### Development Software
|
||
|
||
> List software used to support development, e.g., IDEs.
|
||
|
||
| Name | Version |
|
||
|---------|----------|
|
||
| PyCharm | 2020.1.4 |
|
||
|
||
### 2.3 System Requirement / Target Runtime
|
||
|
||
> List your target runtime(s).
|
||
|
||
| Name | Version |
|
||
|---------|---------|
|
||
| CPython | 3.8 |
|
||
|
||
> Specify system requirements, e.g., the minimum specifications of the server / compute instance you'll be
|
||
> running your software on
|
||
|
||
*Minimum system requirements:*
|
||
|
||
* *Server-grade dual-core CPU, e.g., Intel Xeon E3-1230 v5 or higher*
|
||
* *4 GB of RAM*
|
||
* *1 GBit/s up- and downlink*
|
||
* *20GB SSD storage*
|
||
|
||
## 3 Design Phases
|
||
|
||
> The 13485 requires you to specify "Design Phases". Here are some suggestions which you could use.
|
||
|
||
| Title | Date | Description |
|
||
|----------------|------|-------------|
|
||
| Specification | | |
|
||
| Implementation | | |
|
||
| Testing | | |
|
||
| Validation | | |
|
||
| Release | | |
|
||
|
||
## 4 Avoiding Common Software Defects Based on Selected Programming Technology
|
||
|
||
> Discuss how your selected programming technology may introduce risks and how you plan to avoid them. With
|
||
> modern, dynamically-typed languages, an obvious risk is that you encounter runtime exceptions. So you could
|
||
> argue that your test coverage is great and compensates for that. You could also link to your risk analysis
|
||
> here if you analyse those risks further.
|
||
|
||
## 5 Configuration Management and Version Control
|
||
|
||
> Describe which version control software you're using (probably git, like all human beings on this planet
|
||
> right now, except enterprise developers). Also describe your branching model, i.e., how your developers
|
||
> create branches during development, how you name them and how you merge them (pull requests? merge commits?
|
||
> squash before?). Your code review will be described in the next section.
|
||
>
|
||
> Importantly, describe which things (code, build files, etc.) are put in version control. Describe how you
|
||
> name versions and how you tag them. Your goal should be that you can retrieve an old version and build
|
||
> it. Why? Something with a newer version may go wrong (harm patients) and you may need to roll back.
|
||
|
||
*git is used as version control software. All source code and build files are committed to version control.*
|
||
|
||
*When implementing software requirements, developers create a new branch starting at master. During
|
||
development, developers may create intermediate commits on this development branch.*
|
||
|
||
*When implementation is completed, a new merge commit to master is created.*
|
||
|
||
***This is also the activity which constitutes integration of software units.***
|
||
|
||
*For each release, the goal is to be able to uniquely identify it and retrieve all relevant files (code,
|
||
configuration files like build scripts, SOUPs, etc.) at any time in the future.*
|
||
|
||
*When a new software version is released, its commit is tagged in git. The tag is constructed by adhering to
|
||
semver ([semver.org](https://semver.org)) 2.0.0 which results in a version of format MAJOR.MINOR.PATCH,
|
||
e.g., 1.0.0.*
|
||
|
||
## 6 Documentation Activities
|
||
|
||
> Describe your policy on what should be documented while you develop software. Maybe you want to require
|
||
> your developers to document all methods which are private. Maybe you want to keep an up-to-date software
|
||
> architecture diagram in the repository, etc.
|
||
|
||
## 7 Implementation Verification Activities
|
||
|
||
> Describe verification activities, e.g. code review.
|
||
|
||
*For each pull request, a code review is performed by a team member who was not the main author of the code
|
||
under review. The code review is only marked as "approved" if the code complies with the code review
|
||
criteria. This is:*
|
||
|
||
* *Code fulfils the software requirements*
|
||
* *Adherence to [PEP8 Style Guide](https://www.python.org/dev/peps/pep-0008/)*
|
||
|
||
## 8 Software System Test Activities
|
||
|
||
> Describe software system test activities. This could be continuous integration which is triggered by opening
|
||
> a pull request (e.g. Travis CI, Circle CI). Describe what is tested and how that automated system works.
|
||
|
||
*Integration tests are included in software system tests.*
|
||
|
||
## 9 Validation Activities
|
||
|
||
Validation is carried out as formative and summative usability evaluation as described in the software development process. A usability evaluation file (plan, protocol and report) will be prepared.
|
||
|
||
## 10 Maintenance Activities
|
||
|
||
> Describe how often you check SOUP issue trackers and how you document them.
|
||
|
||
*SOUP issue trackers are checked at least once every 6 months. The verification date is updated in the SOUP
|
||
list accordingly.*
|
||
|
||
---
|
||
|
||
Template Copyright [openregulatory.com](https://openregulatory.com). See [template
|
||
license](https://openregulatory.com/template-license).
|
||
|
||
Please don't remove this notice even if you've modified contents of this template.
|